subline.gif (74 Byte)
CTI -
Innovations
With our wealth of experience accumulated over many years, we serve you by developing optimized technical solutions - from single components right through to complete systems.
1998 New 15ft elevating transfer vehicle
1997 New Pass-over right angle deck
1996 Development of transfer vehicle with movable shuttle conveyor deck
1995 Multi-functional movable truck dock
1994 Development of modules for cargo systems (mechanical/electrical function unit)
1991 Development of a stacker crane with 12 telescopic forks, controlled in groups of 3 for optional horizontal storage of LD3 up to 20ft containers
Testing area with push-skid conveyor system with integrated exhaust drain system
1988 New development: Back-up belt conveyors for large-scale use in automotive paint shops
1987 Assembly lines with push-skid conveyor system with integrated lifting tables
New development: Lifting stations with steel-wire-reinforced belts to lift up the load
1986 Rapid belt conveyor systems for rollboxes
New test skid and system for vehicle testing with separation of skid and car
1985 Delivery of the first pass-over system
1983 Delivery of two side loading docks with load-dependent level control
First skid handling system for the test and finish area with belt conveyors
1982 Commissioning of the biggest fully automated air cargo system in the world
First large-scale system with process control by host computer; PLC of functional areas are linked by a bus system
1979 Development of the multi-functional rollbox
1968 First fully automatic sorter system for unit loads up to 80 kg